论文部分内容阅读
“七·五”期间由国家自然科学基金委和石油天然气总公司共同资助的土壤腐蚀试验网站重点工程大庆中心站,在大庆油田建成。一片有7000m~2的试验场地和一座80m~2的试验室以及埋入地下上千件(钢铁、电缆、光缆、有色金属及非金属材料)的试件,已投入试验。大庆中心站的建成,使我国土壤腐蚀与防护试验研究进入一个新阶段。大庆中心站是根据国家科委(87)国科024号文关于转发“全国土壤腐蚀网站第八次工作会议纪要”和国家自然科学基金委重大项目“材料土壤腐蚀数据积累及腐蚀与防护研究”
During the “Seventh Five-Year Plan” period, Daqing Central Station, a key project of Soil Corrosion Test Station co-funded by the National Natural Science Foundation of China and the Oil and Natural Gas Corporation, was completed in Daqing Oilfield. A test site of 7000m ~ 2 and an 80m ~ 2 laboratory and a sample of thousands of pieces buried underground (steel, cable, fiber optic cables, non-ferrous metals and non-metallic materials) have been put into trial. Daqing Central Station completed, so that China’s soil erosion and protection of experimental study has entered a new stage. Daqing Central Station is based on the State Science and Technology Commission (87) NSG No. 024 on the transfer of “National Soil Erosion Site Eighth Working Conference Proceedings” and the National Natural Science Foundation of China major project “soil erosion data accumulation and corrosion and protection research”