我厂自1985年开始设计制造和使用炼钢电弧炉全水冷挂渣炉壁,其使用寿命(炉龄)是原来镁砂一卤水整体打结炉壁的10倍以上,已使用6年多,没有发生一次事故。通过几年的实践,已摸索出一套成熟的安全操作规程,介绍如下。开炉冶炼之前,要先检查冷却水的供水系统是否正常。特别要注意检查炉壁是否漏水,以免在冶炼过程中发生事故。在冶炼过程中,要保证冷却水正常供给,
I plant since 1985, the design and manufacture and use of steel-making electric arc furnace full water-cooled suspend furnace wall, its service life (age) is the original magnesia a brine more than 10 times the overall knot furnace wall has been used for more than 6 years, No accident occurred. After several years of practice, has developed a set of sophisticated safety practices, introduced below. Before smelting, you must first check the cooling water supply system is normal. In particular, pay attention to check the furnace wall is leaking, so as to avoid accidents in the smelting process. In the smelting process, to ensure the normal supply of cooling water,