自天津市建筑构件公司构件一厂试验成功热拌混凝土以后,我公司接受了试制热拌混凝土的任务,设备的改制成了实现此项新工艺的关键。热拌混凝土一般是将蒸汽经搅拌机中央装置系统,通过装在搅拌臂背后的喷枪或直接通过空心搅拌臂注入混凝土拌合物。这样的装置,设备改动很大,须更换强制式搅拌机中的主要零部件,加工量大,费时间,还要花不少改造资金。我公司第四施工队附属混凝土预制场是
After successfully testing the hot-mixed concrete at Component 1 of Tianjin Building Construction Co., Ltd., our company accepted the task of trial-producing hot-mixed concrete, and the equipment was transformed into the key to realizing this new process. Hot mix concrete is usually steam through the mixer central device system, through the spray gun installed behind the mixing arm or directly through the hollow mixing arm into the concrete mix. With such devices, the equipment has been greatly changed, and the main components in the forced mixer have to be replaced. The processing volume is large and time is wasted, and a lot of reform funds are required. The company’s fourth construction team subsidiary concrete prefabrication field is