论文部分内容阅读
本文以雅砻江锦屏高陡岸坡稳定性及建高拱坝适宜性的论证为例,提出了地质环境条件—岩体力学环境条件—人类工程活动—岩体工程结构的系统动态平衡分析途径,为锦屏Ⅰ级水电站高拱坝工程和具有类似地质环境与岩体力学环境条件的其它高拱坝工程的可行性论证,提供了基本依据。
Taking the demonstration of the stability of the Jinping high steep slope and the suitability of the arch dam in the Yalong River as an example, this paper presents the geological environment conditions - the mechanics environment of the rock mass - the human engineering activity - the systematic dynamic equilibrium analysis path of the rock mass engineering structure, It provides the basic evidence for the feasibility of the high arch dam project of Jinping Ⅰ Hydropower Station and other high arch dam projects with similar geologic environment and rock mechanics environmental conditions.