杭州机械设计研究所在全面总结“七五”计划期间三峡砼搅拌楼科研攻关成果的基础上,根据长江水利委员会三峡工程初步设计中提出的技术要求,完成了生产能力为300m~3/h、240m~3/h 和120m~3/h 多种方案。部机械局邀请了有关专家于1993年8月18日至20日在湖南省五强溪工地召开了初设方案评议会。参加会议的有中国长江三峡工程开发总公司、水利部长江水利委员会、三峡重大办、水利水电工程总公司、湖南省
On the basis of comprehensively summarizing the scientific research results of the Three Gorges Concrete Mixing Building during the “Seventh Five-year Plan”, Hangzhou Mechanical Design Institute completed the production capacity of 300m 3 / h according to the technical requirements set out in the preliminary design of the Three Gorges Project of Yangtze River Water Conservancy Commission, 240m ~ 3 / h and 120m ~ 3 / h variety of programs. Ministry of Machinery Bureau invited the experts in the August 18, 1993 to 20 at the site of Wuqiangxi in Hunan Province held a preliminary program council. The meeting was attended by China Three Gorges Project Corporation, Yangtze River Water Conservancy Commission, Three Gorges Project, Water Resources and Hydropower Engineering Corporation, Hunan Province