近期大震和巨震的地震矩与持续时间

来源 :世界地震译丛 | 被引量 : 0次 | 上传用户:nothingme
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
用证实1960年智利大地震存在低频前驱震的方法处理了国际加速度仪布设(IDA)台站的1~6mHz段的数据,以确定近期22个大震和巨震的地震矩和矩心时间。这22个地震包括1989年马阔里海岭地震,据报道,该地震有低频前驱震(Imhlé et al.,1993)。在1~6mHz频段没有发现这些地震明显的前驱震证据。结果显示,给定断层类型的单侧破裂大地震的地震矩大致与持续时间的平方成正比。这个关系能很好地拟合这些数据。 Data from 1 to 6 mHz of the International Accelerometer (IDA) station were processed to confirm the presence of low-frequency pre-seismic shocks in the 1960 Chilean earthquake to determine the seismic moment and centroid time of the recent 22 major and major earthquakes. These 22 earthquakes included the 1989 Marquoll Ridge Earthquake, which was reportedly pre-damped at low frequency (Imhlé et al., 1993). In the frequency band of 1 ~ 6mHz, no obvious precursory shock evidence of these earthquakes was found. The results show that the seismic moment of a large unilateral rupture with a given fault type is approximately proportional to the square of the duration. This relationship fits well with these data.
其他文献
中南区粮食经济研究协作会第一次会议于1990年12月12日至15日在广东省东莞市召开。会议就粮食企业改革问题进行了研讨。参加会议的代表等共70人。现将几个主要观点综述如下:
国家税务总局国税明电(1993)072号传真电报通知,商业企业1994年期初存货一、二月份动用部份,即一、二月份月末库存余额小于月初库存余额的差额部份,准予作为当月进项税额抵
为改变忽视国内问题的形象,布什近来在教育、环境保护等问题上精心做出了一系列举动的同时,在经济问题上也开出了各种不同的药方。9月27日,在商务部公布第三季度经济呈负增
《财贸经济》今年第10期发表刘光第同志的文章说,现在大家都说搞活大中型企业是深化体制改革的一个重点或关键,那么,究竟什么才叫搞活呢?又怎样才能搞活?所谓搞活,一般地理
射阳县地处苏北平原中部,里下河下游,历史上交通不便,信息不灵,是苏北经济不发达县之一。近几年来,特别是1988年国务院批准射阳为对外开放县以来,在利用外资、举办外商投资
由地矿部申请,经国家外国专家局批准,俄罗斯科学院院士和俄罗斯工程院院士、俄罗斯工程院核心组成员阿里莫夫()于1995年11月3—16日应邀来我国讲学。这是一项智力引进活动。
为了做好一九九四年国有工业企业年度决算的编审工作,现就有关问题通知如下:一、根据今年财税等经济体制改革要求,各地区、各部门要认真抓好年度决算的编审工作,严格执行国
文化信息资源共享工程是我国目前为止最大的公益性文化资源工程,是国家重大建设工程之一。该工程以各级公共图书馆、文化站等为依托,整合和传播优秀文化数字资源,满足基层群
世界知识产权组织仲裁与调解中心3月28日公布的2012年审议报告显示,该中心2012年接到的与互联网域名抢注纠纷有关的投诉比2011年增加4.5%。审议报告提供的数据显示,世界知识
财务状况变动表是一张综合反映企业营运资金静态存量和动态流量的资金报表。他从经营和理财两个方面来说明企业财务状况变化的原因和内容,弥补了资产负债表和损益表的不足,