论文部分内容阅读
在接到煤炭工业部发下的关于“岩心钻探时升降钻具的自动化”(苏联先进经验)一文后,在队领导的重视和合理化建议委员会的支持下,参考文献精神和示意图的原理,我们就开始了设计、制图、描绘等工作。由于技术革命委员会和厂领导的重视以及各车间工人同志的积极努力,克服了设备不全等困难,经过五天苦战,于9月4日试制成功。由于在设计时大胆的把原示意图修改了六个部分,在加工过程中又把权限下放到车间;当发现图纸有问题时,车间可以大胆
After receiving a paper on the “Automation of Lifting Drilling Tools for Core Drilling” (Soviet Advanced Experience) issued by the Ministry of Coal Industry, under the leadership of the team’s leaders and with the support of the Rationalized Suggestion Committee, the spirit of the reference literature and the principle of the schematic diagram, we The work of designing, drafting, drawing, etc. began. Thanks to the attention of the technical revolutionary committee and factory leaders and the active efforts of the workers’ comrades in the workshops, they overcome difficulties such as incomplete equipment. After five days of hard work, they were successfully tested on September 4. Due to the bold modification of the original schematic diagram to the design of the six parts, the authority is also delegated to the workshop during the process; when a problem with the drawings is found, the workshop can be bold.