瑞典瓦坦福尔公司的Porsi水电站正在用升压发电机 (Powerformer)取代发电机和升压变压器。新升压发电机是迄今为止最大的这类发电机 ,额定电压 15 5kV ,额定容量 75MVA ,额定转速 12 5r min。将于 2 0 0 0年底投运
The Wattsford Porsi hydroelectric plant in Sweden is replacing generators and step-up transformers with a Powerformer. The new boost generator is by far the largest such generator with a rated voltage of 15 5kV and a rated capacity of 75MVA at a nominal speed of 125r min. Will be put into operation by the end of 2000