东深工程七个抽水站的十台轴流泵和异步电动机,过去只在旱季用来抽水,一九六五年在出水管加装启闭止回盖后,还可在泄洪期发电,并入电网。既充分挖掘了设备潜力,又充分利用了泄洪水力资源,不需增加费用。平均每台机组每年可发电五点四万度,从六五年至七一年共发电三百二十万度。有力地支援了社会主义建设。
Ten axial and asynchronous motors at the seven pumping stations of the Dongshen Works were used for pumping water only in the dry season. After the opening and closing check-ups were installed in the discharge pipe in 1965, they were also capable of generating electricity during the flood season and Into the grid. Not only fully tap the potential of equipment, but also make full use of flood water resources, without increasing costs. On average, each unit can generate 54,000 kWh a year, generating 3.2 million kWh from 65 to 71 years. We have vigorously supported the building of socialism.