论文部分内容阅读
一、简介:乌江渡发电厂总装机63万瓩,单机容量21万瓩,为贵州省电力系统主力电厂.主要供电贵阳、遵义地区,并与四川联网送往重庆,由于电厂坝址处于河床狭窄、两岸陡峻的悬崖峭壁之间,采用厂坝相连、厂顶挑流的枢纽布置形式.四台主变压器和110千伏开关站布置在坝内付厂房635.055米高程和648.70米高程上,而220千伏开关站位于大
I. INTRODUCTION: Wujiangdu Power Plant has a total installed capacity of 630,000 瓩 and a stand-alone capacity of 210,000 瓩, which is the main power plant in Guizhou Province. It mainly supplies electricity to Guiyang and Zunyi areas and interconnects with Sichuan to Chongqing. Due to the narrow riverbed , Steep precipices between the two sides of the Strait, the use of factory dam connected to the plant layout of the hub of the layout of the layout of the four main transformers and 110 kV switchyard layout within the dam to pay 635.055 meters elevation and 648.70 meters elevation, and 220 KV switch station is located in large