据《Gas Turbine World》2014~2015年年度手册发布了2013年1月到2014年6月中国(包括台湾)向国外订购的燃气轮机及其安装的详细情况。叙述了燃气轮机装置订购和安装的细节,包括地区、开发商和现场、类型(简单循环,联合循环,船舶推进,油&气产输,热电联产,独立电力生产商)、燃气轮机数量和型号、机组ISO额定功率、燃气轮机制造厂商以及燃料。
According to Gas Turbine World’s 2014-2015 Annual Manual, the details of gas turbines and their installation ordered overseas by China (including Taiwan) from January 2013 to June 2014 were released. The details of ordering and installing gas turbine installations are described, including area, developer and site, type (simple cycle, combined cycle, marine propulsion, oil & gas transmission, combined heat and power, independent power producer), number and type of gas turbine, Unit ISO rated power, gas turbine manufacturer and fuel.