论文部分内容阅读
文章论述了马脊梁矿井选煤厂输送系统改造的设计原则、主要方案及主要工艺设备的选型方法,为矿井选煤厂物料输送系统的新、改、扩建项目初步设计提供了依据。
The paper discusses the design principle, main plan and selection method of the main process equipment in Majiliang Coal Preparation Plant. It provides the basis for the preliminary design of new, modified and expanded project of material conveying system in coal preparation plant.