自6月22日至7月15日,黄河防汛总指挥部组织的检查团,检查了河南、山东两省黄河防汛准备工作。检查团沿途听取了6个专区的12个县关于黄河防汛与滞洪准备工作的汇报,具体检查了堤线、埽坝、分洪口和滞洪区围村埝、避水台等工程。重点深入到乡、社了解了农村防汛工作发展的情形和存在的问题,同时检查团针对当地工作进展的实际情况提出
From June 22 to July 15, the inspection team organized by the Flood Control Headquarters of the Yellow River examined the preparations for flood control of the Yellow River in Henan and Shandong provinces. The inspection team listened to the reports of 12 counties in 6 prefectures on the preparations for flood control and flood detention in the Yellow River along the embankment, specifically examining the embankments, dam bars, flood diversion openings, and surrounding villages in the detention basin and water-avoidance stations. Focus on going to the township, the community understand the development of rural flood control situation and existing problems, while the inspection team for the progress of local work put forward the actual situation