论文部分内容阅读
本文提出了梯级水电站群补偿调节的大系统分解协调算法,并以汉江上游石泉安康梯级水电站为例,给出了计算结果。
In this paper, a large-scale system decomposition coordination algorithm for cascade hydropower station group compensation is proposed. The calculation results are given based on the Ankang cascade hydropower station in the upper reaches of the Han River.