模式口水电站为永定河引水工程的一部分,原計划于1956年兴建引水工程。57年兴建水电站,至58年末同时完成。但55年底由于首都工業的迅速發展及人口的日益增多,工業及民用用水都迫切需要引用永定河水,因而决定于56年初全线提前开工,要求“七一”基本完成过水工程,以便放水。官厅水电工程处在今年一月五日接到水力發电建設总局下达关于水电站的建設任务后,即以最快速度进行筹备,实际施工准备工作只用了三天的时間,56年1月16日正式动工,到九月底全部水工建筑及机电安裝,即告完工。整个工
Model Kou Hydropower Station is part of the Yongding River diversion project and was originally planned to construct a diversion project in 1956. 57 years to build hydropower stations, to be completed by the end of 58. However, due to the rapid development of the capital industry and the increasing population at the end of 55, there was an urgent need to refer to Yongding River for both industrial and civil water use. Therefore, it was decided that the project should be started ahead of schedule in early 2006 and required that the water transfer project be basically completed in July 1 to facilitate drainage. Guanting Hydropower Engineering Department received the task of building hydropower stations issued by the General Administration of Hydroelectric Construction on January 5 this year, that is, the preparatory work for the actual construction took only three days, January 56 Officially started on the 16th, by the end of September all the hydraulic construction and mechanical and electrical installation, that is completed. The whole work