论文部分内容阅读
本文根据水利水电工程项目的特点,结合实际工程施工中遇到的问题,总结并分析出工程施工进度控制的任务及措施等相关内容。
Based on the characteristics of water conservancy and hydropower projects and the problems encountered in the actual construction, this paper summarizes and analyzes the tasks and measures of construction schedule control.