80年代是碾压混凝土坝建设,从仅仅是一种设想变为完全被接受的施工方法的10年。经70年代的试验和80年代初期的初步实践,到80年代末期成功地建成了一些大型碾压混凝土坝,并考虑建设坝高近于200m的碾压混凝土坝。碾压混凝土方法在短期内已成为被接受的施工方法。
The 1980s was a decade of construction of RCC dams, from just one idea to a fully accepted construction method. After the tests of the 1970s and preliminary practices in the early 1980s, some large-scale RCC dams were successfully built up by the late 1980s and the construction of RCC dams of nearly 200m in height was considered. The RCC method has been accepted as a construction method in the short term.