解放以来,在江苏省平原地区已建成数以百计的大中型水闸。在这些水闸的设计和施工中,越来越多地采用了装配式预制构件。特别是最近几年,在水闸的上层结构如钢筋混凝土胸墙、工作桥、人行桥以及公路桥等,一般都尽量采用预制构件。通过施工实践证明:采用了装配式预制构件后,不仅对模板的周转率大大地提高了,而且可缩短整个施工期限的14~20%,加快了施工进度。如今后水闸工程的工业化施工,提供了良好的开端。
Since liberation, hundreds of large and medium sluices have been built in the plain area of Jiangsu Province. In the design and construction of these sluices, prefabricated prefabricated structures are increasingly being used. Especially in recent years, the superstructures of sluice such as reinforced concrete chest wall, working bridge, footbridge and highway bridge, etc., are generally try to use prefabricated components. Through the practice of construction, it is proved that the prefabricated prefabricated components not only greatly improve the turnover rate of the formwork, but also shorten the construction period by 14-20% and speed up the construction schedule. Today, after the sluice project of industrial construction, provides a good start.