我厂生产电动葫芦配套用的钢丝绳截断工艺,最初都采用手工扎头切断的办法,即先用0.5毫米的钢丝将头部结扎起来,然后将钢丝绳切断。采用这种方法不仅工效低,三个人每班只能完成30根左右,而且质量不能保证,操作不安全。在无产阶级文化大革命中,我厂广大革命职工在厂党委和革委会的正确领导下,大搞技术革新,对钢丝绳切断扎头的落后工艺进行了成功的改革。利用废电焊机的变压器和废旧材
I plant the production of electric hoist supporting the use of wire rope truncation process, the first use of hand-cut off the first approach, that is, first with 0.5 mm of steel wire ligation of the head, and then the wire rope cut off. This method not only low efficiency, three people can only finish about 30 per class, and the quality can not be guaranteed, the operation is not safe. In the Great Proletarian Cultural Revolution, under the correct leadership of the Party Committee and the Revolutionary Committee of the factory, the vast majority of revolutionary workers in our factory vigorously carried out technological innovations and successfully carried out successful reforms in the backward process of cutting off steel wire ropes. The use of waste welding transformers and scrap materials