论文部分内容阅读
“两航基地工程”是第三航务工程局五公司新建预制厂工程和上海航道局基地工程两项工程的简称。 该工程北岸坡在陆上抛填施工中发生滑坡,滑坡体将航道局码头~#4引桥基桩推断4根,并造成其余桩均产生不同程度的倾斜,最大倾斜度达到11%。同时也使~#3引桥基桩
“Two-Hanging Base Project” is the abbreviation of two projects of the New Third Prefabrication Plant of the Third Navigation Engineering Bureau and the base of Shanghai Waterway Bureau. The landslide occurred on the landfill construction on the north bank slope of the project. The landslide body deduced 4 spoils from the navigation channel pier to the # 4 bridge abutment and caused the remaining piles to have different degrees of inclination with the maximum inclination reaching 11%. At the same time ~ # 3 cited bridge foundation pile