论文部分内容阅读
本文叙述了1983年11月贵州红枫水库溢洪道扩建工程七次爆破地震效应的观测方法,分析了爆破地震动的特征和周围建筑物的爆破地震效应,并讨论了局部场地条件对爆破地震效应的影响。
This paper describes the observation method of seven blasting seismic effects of Hongfeng Reservoir spillway expansion project in November 1983, analyzes the characteristics of blasting ground motion and the blasting seismic effects of surrounding buildings, and discusses the influence of local site conditions on blasting seismic effects influences.