一、问题的提出 用网络模型来编制工程进度计划,目前其他部门已经应用得比较多,而在水利水电工程施工方面至今应用甚少.究其原因,从技术角度而言,这与它的限制条件多有关系.这些限制条件中,除了人力、物力和资金等资源条件的限制外,时间的限制更是一个突出的问题.这是因为水利水电工程的规模大,施工时间长,而且都是野外施工;所以不仅受到资源、设备到货时间的限制,而且还受到水文、气象等自然条件的限制.另外,还有一些人为的限制,如分期施工、分期投产的要求等.由于这些限制条件,就产生了一些有时间限制的施工项目(或称工作).其中,有的开工时间有规定;有的完工时间受限制;还有的开工与完工时间都有明确规定的日历时间(如表1所示).
First, the problem raised With the network model to prepare the project schedule, the other departments have been applied more, but in the water conservancy and hydropower engineering has little application so far. The reason, from a technical point of view, this is with its limitations Time and space constraints are more prominent than the restrictions on resources such as manpower, material and financial resources, which are caused by the large scale and long construction period of water conservancy and hydropower projects, So it is not only restricted by the resource and the arrival time of equipment, but also restricted by the natural conditions such as hydrology and meteorology etc. There are also some man-made restrictions such as the construction by stages and the requirements of phased-in production etc. Because of these restrictions , There are some time-limited construction projects (or work), of which there are some start-time provisions; some completion time constraints; there are start-up and completion time have clearly defined calendar time (such as the table 1).