论文部分内容阅读
一、序言在安装工程中,预留预埋阶段的产品成活率已经是一个关系到工程质量的问题与成本的很大一部分因素,所以本项目部专门成立QC小组对预留预埋阶段的质量管理进行了研究与实践,运用动态控制理论,实行PDCA模式动态控制,对预留预埋阶段每个细节细心研究、分析,并不断改进,终于将该阶段的
Preface In the installation of the project, to set aside the embedded phase of the product survival rate is already a project related to the quality of the problems and costs a large part of the factors, so the project department set up a dedicated QC group to reserve the quality of the embedded phase Management of the research and practice, the use of dynamic control theory, the implementation of PDCA dynamic control mode, the details of the reservation embedded in every detail of the careful study, analysis, and continuous improvement, and finally the stage of