库底清理工程是大中型水库开发利用的基础。由于库底清理工作量大面广,与库区移民利益紧密相关,与移民迁建工作交叉进行,具体组织实施难度较大.把清库作为移民迁建专项工程来安排,在陕西省尚属首次.本文就安康电站水库库底清理工程组织实施的实践与体会,作一简要介绍,供从事这方面工作的同行们借鉴。安康电站是全国的大型水电站工程。电站大坝位于汉江上游安康市以西18公里的火石岩。电站水库建成后,干流洄水128公里,正常蓄水位时水面
Reservoir cleaning project is the basis for the development and utilization of large and medium-sized reservoirs. Due to the large amount of work to clear the bottom of the reservoir, which is closely related to the interests of resettlers in the reservoir area and cross-linked with the relocation and relocation work of the reservoir area, it is more difficult to organize and carry out the resettlement project specifically. For the first time, this paper gives an introduction to the practice and experience of the implementation of the Ankang Hydropower Station Reservoir Bottom Cleaning Project organization for reference by colleagues who work in this field. Ankang Power Station is a national large-scale hydropower project. The dam is located in the upper reaches of the Han River Ankang 18 kilometers west of the Flint rock. After the completion of the power station reservoir, the main stream will move 128 kilometers and the normal water level will be water surface