论文部分内容阅读
格隆·格鲁伯公司在挪威中部的一座地下矿年产铜锌硫化矿石50万t。该矿平碉开拓,采用分段采矿法和房柱采矿法开采矿石。就厚度、倾角和形状来说,矿体极不规则。1977年以来,该矿一直使用电子计算机制定各种矿山计划和进行工程设计。大部分计算机软件是该公司根据具体需要开发的。使用了各种计算机程序,以处理矿山测量和地质数据、计算矿石的品位和储量、进行生产统计、编制生产计划、进行采矿设计和更新采矿技术信息。
Grönberger produces 500,000 tonnes of copper-zinc sulfide ores in an underground mine in central Norway. The mine flat tower to open up, the use of sub-mining method and the column and column mining method mining ore. In terms of thickness, inclination and shape, the ore body is extremely irregular. Since 1977, the mine has been using computers to develop various mine plans and engineering designs. Most computer software is developed by the company for specific needs. Various computer programs were used to process mine surveys and geological data, calculate the grades and reserves of ores, conduct production statistics, prepare production plans, conduct mining design and update mining technology information.