论文部分内容阅读
聊城修防处在今年春修工作中,认真贯彻了黄河水利委员会指示的「平衡发展,全面提高」的方针,既强调加强了工程质量,又提高了效率,且均有愿着成绩。特别是在贯彻工程质量标准方面,于一期土工中,各段实地深入工地检查质量达一○九六八个点,并注意提高效率的作法,更值得各地学习。该处一朋春修施工总结很好,特予通报·各修防处、段应根据各地具体情况认真加以研究,吸取经验,丰富镇导,以达到提高春修工作之目的。
In this year’s spring repair work, Liaocheng Rehabilitation Department conscientiously implemented the guideline of “balanced development and overall improvement” instructed by the Yellow River Conservancy Commission, emphasizing both the enhancement of project quality and efficiency and the willingness to achieve results. In particular, in the implementation of engineering quality standards, in the first phase of geotechnical engineering, the quality of on-site site inspections in various sections reached 10996 points, and attention should be paid to efficiency improvement, which deserved further study in various places. The Department of friends spring construction summary is very good, special notification · The repair offices, sections should be based on the specific circumstances of each area to seriously study, learn from experience, enriching the leadership in order to achieve the purpose of improving the spring repair work.