论文部分内容阅读
针对造气能力扩大后,吹风气回收装置的配置问题进行探讨,提出了合理的优化方案。
In view of the expansion of gas production capacity, the configuration of the blower gas recovery unit is discussed, and a reasonable optimization plan is proposed.