卷材排气屋面施工法,是在屋面找平层表面呈现白色后(时经1~3昼夜),进行控制分格、打底油、铺毡,并使卷材层与找平层间部分形成空隙,以达到排出基层潮湿气体的一种施工方法。
The coil exhaust roof construction method is to control the partition, make the base oil, spread the felt and form a gap between the coil layer and the leveling layer after the surface of the roof leveling layer appears white (1 to 3 days and nights). In order to achieve a construction method that removes moisture from the base layer.