在毛主席无产阶级革命路线指引下,在批林整风和批林批孔运动的推动下,我公司第三工程队全体职工坚持以阶级斗争为纲,抓革命、促生产,在建国门外高层外交公寓工程上采用大模板施工,在完成了试验楼工程的基础上,又建成了一幢14层大楼(图1)。通过试验楼工程和高层公寓施工实践,证明大模板施工不仅解决了高层建筑设计中在抗震要求下的“肥梁胖柱”问题,改变了目前“秦砖汉瓦”的落后局面,而
Under the guidance of Chairman Mao’s proletarian revolutionary line and the promotion of the forestry industry and the approval of forest approval, all employees of our company’s third engineering team adhered to the class struggle as the key point, grasping the revolution and promoting production, and building high Diplomatic apartment construction uses large formwork construction. On completion of the pilot building project, a 14-story building has been built (Figure 1). Through trial building projects and high-rise apartment construction practices, it was proved that the construction of large formwork not only solved the problem of “fat plump columns” under the earthquake-resistant requirements in high-rise building design, but also changed the current backward situation of “Qin brick-tile”.