论文部分内容阅读
介绍了深圳地铁5号线前海湾至黄贝岭段的防水设计,对工程采用的EVA自粘防水卷材作了介绍,主要阐述了明挖法隧道和暗挖法隧道工程各部位的防水层施工流程、施工方法、施工注意事项及质量控制方法。
The waterproof design of the Qianhai Bay to Huang Beiling section of Shenzhen Metro Line 5 is introduced, and the EVA self-adhesive waterproofing membrane used in the project is introduced. The construction process of the waterproof layer in each part of the tunneling and undercut tunneling , Construction methods, construction precautions and quality control methods.