论文部分内容阅读
一、工程概况中日友好医院工程建筑面积90000余平方米,地下工程建筑面积7000平方米,为现浇钢筋混凝土结构。±0.00以上除部分梁、板和外墙板为预制外,所有柱、剪力墙均为现浇钢筋混凝土。根据施工布署,组合钢模板需用量为24000平方米。支撑系统采用10×10厘米和5×10厘米方木。图1为组合钢模板施工现场。二、组合钢模配置原则 1.墙柱、地梁均采用竖排板,梁采用横排板。
I. Project Overview China-Japan Friendship Hospital has a project construction area of more than 90000 square meters and underground engineering construction area of 7000 square meters. It is a cast-in-place reinforced concrete structure. Above ±0.00, except for some beams, slabs, and outer wall panels that are prefabricated, all columns and shear walls are cast-in-place reinforced concrete. According to the construction deployment, the combined steel template requires a dosage of 24,000 square meters. The support system uses 10 x 10 cm and 5 x 10 cm square beams. Figure 1 shows the combined steel formwork construction site. Second, the combination of steel mold configuration principles 1. Wall columns, ground beams are used vertical boards, beams used horizontal boards.