分析了水利水电工程前期勘察设计取费目前存在执行依据版本多、对取费依据认识模糊、工作深度要求与费用不匹配等问题,结合水利水电工程前期工作特点,揭示了问题的主要焦点,阐明水利水电工程前期勘察设计应根据水利水电工程特点取费,不能统一按“1283号文”。在分析了现行前期勘察设计取费主要依据、产生背景,尤其是对“1352号文”进行深入解读后,认为水利水电工程前期勘察设计取费应采用“1352号文”作为依据。
This paper analyzes the problems in the early stage of survey and design fees for water conservancy and hydropower projects such as the version based on many versions, vague understanding of the basis for taking charges, and the mismatch between the requirements for work depth and the expenses, and reveals the main focus of the issue by clarifying the preliminary work features of water conservancy and hydropower projects Preliminary survey and design of water conservancy and hydropower projects should be based on the characteristics of water conservancy and hydropower engineering fees, can not be unified press “No. 1283 ”. Based on the analysis of the main basis and the background of the current survey and design fee, especially after the thorough interpretation of “No. 1352 ”, it is considered that the survey and design fee for the early stage of water conservancy and hydropower project should be based on “Document No. 1352” .