自2011年5月开工建设以来,萧山杭氧气体公司氮气及二氧化碳回收项目工程进展顺利。萧山杭氧项目主要有一套20万t/a二氧化碳设备和一套KDN3200/125Y型纯氮设备。经过九个多月的努力,项目已初具规模。办公楼、厂房等主体已经全部完成,设备基础验收合格并移交安装单位。纯氮装置安装接近完成,开始协调单机试车和系统联动试车。二氧化碳回收装置大部分设备已经就位,
Since May 2011 construction started, Xiaoshan Hangzhou oxygen gas company nitrogen and carbon dioxide recovery project is progressing well. Xiaoshan Hang oxygen project mainly has a 200,000 t / a carbon dioxide equipment and a set of KDN3200 / 125Y pure nitrogen equipment. After more than nine months of hard work, the project has begun to take shape. The main body such as office building and factory building have all been completed, the basic acceptance of the equipment is passed and handed over to the installation unit. Installation of the pure nitrogen device is nearing completion and coordination of stand-alone test and system test run is started. Most of the equipment for carbon dioxide recovery is in place,