论文部分内容阅读
关于利用料石安砌水輪机室及尾水管的施工和安装,已在我刊1958年第6期發表,为了满足讀者的要求,现請罗庆荣同志就料石安砌水輪机室及尾水管的設計方面,作些补充介紹。
The construction and installation of the turbine room and the draft tube by using stone material have been published in Issue 6 of 1958. In order to meet the requirements of the readers, we urge Comrade Luo Qingrong to work on the construction of the turbine room and tail Water pipe design, make some supplements.