龙潭电站发电隧洞及压力管道直径选择

来源 :江西水利科技 | 被引量 : 0次 | 上传用户:hudongfei
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
中、小型电站发电引水隧洞及压力管道的直径一般按经验公式或经济流速来确定。龙潭电站发电引水隧洞及压力管道较长,分段较多,且运行方式比较特殊(汛期电站只担任一小时调峰任务,枯水期担任腰荷或峰荷),若采用常规方法选择洞径,工作量大,且难以考虑各方面的因素。为了全面反映该电站各因素间的内在联系,并能迅速地找到全局最优方案,采用了系统工程方法来选择 Medium and small power station diversion tunnel and pressure pipe diameter generally empirical formula or economic flow rate to determine. Longtan hydropower station diversion tunnel and the pressure pipe is longer, more sub-sections, and the operation mode is rather special (flood season power station only for one hour peak load task, dry season as the waist load or peak load), if the conventional method to choose the diameter, work Large amount, and difficult to consider all aspects of the factors. In order to fully reflect the power plant internal factors between the various factors, and can quickly find the best global solution, the use of systems engineering methods to choose
其他文献
一、流域概况九龙江西溪发源于博平山脉的佛耳山之间,流域面积约为4000平方公里,河流主干道全长171公里,流域形状呈扇形,上游分:花山溪流经平和在南靖与船场溪会合,向东流至
由南京水科院进行的淮河正阳关至茨淮新河口大型防洪河工模型试验研究,历时3年,于1988年9月17日通过鉴定。试验河段长120多公里,摆幅25公里,模型水平及垂直比尺均为1/100,变
由于受到世界饲料价格上升的影响,东南亚各国今年将增加饲料进口,以适应发展畜牧业所需。 据称,今年度东南亚国家进口玉米将增加10%~15%,其中以印尼进口最多,还有马来西亚及泰
以双湖地堑为代表,羌塘地体内最新构造表现为东西向伸展作用下产生的南北向地堑构造,双湖地堑由一系列近于平行的北东至北北东向正断层组成,断层几何学、运动学及断陷盆地内
一、概述岩滩水电站为目前广西在建的最大水电站,装机容量121万瓩,施工导流采用左岸开挖大明渠右边设导流墙,穿经主体工程部份从#19~23坝段做成八个4×10米底孔,顶板高程163米
近年来,日本的坝工建设由于水利资源的有效利用和经济的发展,综合利用工程比单一目的工程建造数量要多。在坝型分类统计上看,以填筑坝(包括土坝和堆石坝)为主,占60%,重力坝
正在施工中的四川铜街子水电站,拦河坝坝基靠左岸处有一深槽,槽口宽约40米,最深达70米,主要充填砂卵石,但中部夹有20米厚的粉细沙。由于挖除困难,采用覆盖层上建堆石坝,坝基
去年我省集中暴雨较多,江河水位猛涨,农田水利工程水毁严重,遭受破坏的拦河坝达250多座,多是柳石坝和半永久性溢流堆石坝。拦河坝被水毁情况有的是坝被彻底冲毁需重建的;有
《中华人民共和国水法》的颁布实施,标志着我国进入了以法治水新阶段。希望各级政府,要抓好本地区的江河治理及水资源的开发、管理和保护,抓好防汛抗旱工作,抓好农村水利和
在农道桥梁浇注中,你想省工、省料、省时间吗?请不妨试用安达市水利技术人员创造的 In the bridge farming in the road, you want to save time, save material, save time