1 概 述阎王鼻子水库枢纽由 10孔溢流坝、3孔冲砂闸、工业取水口、农业取水口和电站取水口等坝段组成 .阎王鼻子水库的电气设计包括施工用电设计和永久用电设计 .永久用电部分包括枢纽、电站和管理处用电三个部分 .距阎王鼻子水库 8km处大营子地区有 1座 6 6k V变电所 ,原准
1 Overview Yan Wang nose reservoir by the 10-hole spillway dam, 3-hole red sand gate, industrial water intake, agricultural water intake and power station intake and other dam section composition.Yan Wang nose reservoir electrical design, including the design of electricity supply and permanent electricity Design.Permanent electricity use part includes hub, power station and management office electricity.From Yan Wang nose reservoir 8km at Dayingzi area has a 6 6kV substation, the original standard