新建200km/h客货共线铁路设计暂行规定机务篇的思考

来源 :铁道标准设计 | 被引量 : 0次 | 上传用户:seny668
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
新建200 km/h客货共线铁路的建设,规定机车牵引的客车时速均达160 km以上,货运机车相应配套的速度目标值为120 km/h。随着长交路、单司机乘务制度的推行,铁路机车运用、检修以及管理体制的改革与创新,机车的可靠性提高,机务信息化的建设及机务生产力布局适时的调整都对机务设备设计提出了新的要求,为顺应新形式下机务设备设计的需要制定了新建200 km/h客货共线铁路暂行规定,介绍其中机务篇的相关内容。 The construction of a new 200 km / h passenger and freight cross-border railway stipulates that the speed of passenger cars towed by locomotives should reach 160 km / h and that of cargo wagons be 120 km / h. With the long-distance transportation, the implementation of single driver’s service system, the reform and innovation of railway locomotive operation, overhaul and management system, the reliability of locomotives, the construction of locomotive information system and the timely adjustment of locomotive productivity layout all put forward the design of locomotive equipment A new requirement was formulated and an interim regulation on the construction of 200 km / h passenger and freight cross-border railway was formulated to meet the needs of the design of maintenance equipment under new forms. The relevant contents of the maintenance and repair articles were introduced.
其他文献
资产管理对保险公司的经营发展至关重要,通过资产管理,可以降低或化解保险公司的财务风险,提高偿付能力,但资产管理并不等同于资金运用,在进行金融资产投资的同时,保险公司更多的可
通过对体育馆建筑无梁篮球比赛大厅楼盖结构设计的工程实例的探讨,介绍了一种新型的无梁楼盖结构——现浇混凝土空心无梁楼盖的设计方法及其构造设计,并提出了目前极需完善和
针对软弱围岩双连拱隧道三导洞施工方案的特点,采用有限元方法对其施工过程各阶段围岩与支护体系的力学性状进行了分析,并与实测结果进行对比分析。拱顶沉降和周边收敛明显分为
以苏州凤凰国际书城为例,介绍了该高层钢结构的施工方案、伸臂桁架以及钢柱的吊装方法,并通过选取的不利荷载工况组合、拟定的施工步骤及拟采用的施工措施,采用了有限元软件A
论文针对结构力学课程传统考试命题方式存在主观性、随意性、命题标准不明确等弊端,指出了建设结构力学试题库在实现教考分离、全面提高教学质量等方面的重要意义,阐述了结构