南水北调东线江苏水源有限责任公司省南水北调泗洪站枢纽工程建设处泗洪站枢纽工程于2009年11月正式开工,是我省南水北调单体投资最大的泵站工程。工程2013年4月顺利通过江苏水源公司组织的试运行验收。2013年5月通过省南水北调办组织的通水验收。泗洪站枢纽工程位于江苏省泗洪县朱湖乡东南的徐洪河上,是南水北调东线一期工程第四梯级泵站之一,主要功能是与睢宁、邳州泵站一起,通过徐洪河向骆马湖输水。泵站设计流量120m3/s,安装贯流泵机组5台套,单机设计流量30m3/s,总装机容量10000kW。工程总投资5.59亿元。
East Route of South-to-North Water Diversion Project Jiangsu Province Water Source Co., Ltd. South-to-North Water Diversion Project of Sihong Station Hub The Sihong Hydropower Station project was officially launched in November 2009 and is the largest pumping station project invested by the South-North Water Diversion Project in our province. In April 2013, the project passed the trial run acceptance organized by Jiangsu Water Resources Company. In May 2013, it passed the acceptance inspection of water supply organized by the Provincial South-to-North Water Diversion Project. Sihong Station is located in Xuhong River, southeast of Zhuhu Township, Sihong County, Jiangsu Province. It is one of the fourth step pumping stations in the first phase of the South-to-North Water Diversion Project. Its main functions are to pump water from Suining and Danzhou pumping stations, Luoma Lake water. Pumping station design flow of 120m3 / s, the installation of tubular pump unit 5 sets, single design flow 30m3 / s, the total installed capacity of 10000kW. The total investment of 559 million yuan.