论文部分内容阅读
通过对乌28-9H井施工情况分析,对筛管顶部注水泥完井工艺及其延伸工艺进行介绍,对筛管顶部注水泥完井工艺优劣性进行了分析,对现场筛管顶部注水泥工艺的改进有指导意义。
Through the analysis of the construction of Wu 28-9H well, the cementing completion technology and its extension process at the top of sieve pipe are introduced. The advantages and disadvantages of the cement injection well completion technology at the top of the sieve pipe are analyzed. Process improvement is instructive.