论文部分内容阅读
由上海市建二○八工程队承建的上海医疗专科学校图书馆工程,建筑平展呈“L”型,外墙清晰,室内布置明亮活泼,其中尤以浮雕石膏板平顶令人青睐。施工浮雕石膏板平顶之前首先要审图,要理解设计意图,有问题均要在施工之前一一弄清。第二步即进行认真作图,画出平顶排列图,标明:龙骨的走向和间距,平顶筋的分格和预留洞的位置,平顶和窗帘箱的节点处理,平顶和墙、柱的节点处理,尽可能取得四周统一。通过审图和作图,加深了对平顶施工要求的认识,在结构施工中就可以考
The Shanghai Medical College library project built by the Shanghai Construction 2008 engineering team has a flat “L” type building with a clear external wall and a bright and lively interior layout. Among them, relief plasterboard flat top is very popular. Before constructing the embossed gypsum board, it is necessary to review the plan. To understand the design intent, problems must be clearly identified before construction. The second step is to make a careful drawing and draw a flat-top arrangement diagram, indicating: the orientation and spacing of the keel, the division of the flat top ribs and the position of the reserved hole, the treatment of the flat top and the node of the curtain box, the flat top and the wall The processing of the nodes of the column is as uniform as possible. Through reviewing plans and drawing, we have deepened our understanding of flat roof construction requirements and we can examine it during construction.