中国实验快堆(CEFR)热功率为65 MW,试验发电功率为20 MW.首炉燃料使用UO_2,采用堆本体池式结构和钠一钠水三回路热传输系统.并首次独立设立非能动事故余热排出系统。2011年7月,CEFR实现40%额定功率稳定发电24 h.完成了国家要求的验收目标。2014年,CEFR的主要工作包括按调试大纲要求进行了C阶段调试试验项目、定期试验、维护保养、预防性维修及纠正性维修丁作,于2014年
China Experimental Fast Reactor (CEFR) has a thermal power of 65 MW and a test power of 20 MW. The first furnace fuel uses UO 2 with a bulk body pool structure and a sodium-sodium water three-circuit heat transfer system, and establishes an independent passive event for the first time Waste heat discharge system. In July 2011, CEFR achieved a stable power generation of 40% of rated power for 24 hours, fulfilling the acceptance target required by the country. In 2014, the main tasks of CEFR included C-phase commissioning of pilot projects, periodic testing, maintenance, preventive maintenance and corrective maintenance according to the requirements of the commissioning program. In 2014,