几年来,在水电施工中严重地存在着边勘测、边设计、边施工,以及边施工、边准备的情况,造成施工的忙乱和被动。要改变这种情况,重要工作之一是加强施工组织设计工作。为此,电力工业部和国家建设委员会、水力发电建设总局、上犹水力发电工程局和工地设计代表组一起对上犹水电工程的施工组织设计进
In the past few years, there has been a serious situation in the hydropower construction while surveying, designing, constructing and carrying out side-by-side construction, resulting in hectic construction and passive construction. To change this situation, one of the important tasks is to strengthen the construction organization design work. To this end, the Ministry of Electric Power Industry and the State Construction Commission, Hydroelectric Power Construction Bureau, the Utah hydroelectric power engineering bureau and site design team together on the Utah water project construction organization design