1.概述在武钢现有生产条件下,炉渣水淬是一项处理商炉炉渣的生产工艺,以此代替五六十年代的抛渣法。炼铁厂现有四座高炉,除4号高炉采用炉前水力冲渣外,其他三座高炉的炉渣处理,均使用1号泡渣池进行翻罐出渣水淬。矿渣厂1号泡渣池于1960年建成投产,有两个33.2×12×7.2米的水渣池,总容积为5737米~3。其主要设备有渣壳打盖机、渣罐倾翻机和15吨桥式抓斗吊车。1986年年产水渣已达110万吨。 1号泡渣池现行炉渣水淬过程按标准化程序操作。但在隆冬季节的水淬过程中,爆炸现象比较频繁。据不完全统计,1985年10
1. Overview In the existing production conditions in WISCO, slag water quenching is a process of commercial furnace slag production process, in order to replace the slag throwing method of the fifties and sixties. The existing four blast furnace blast furnace, in addition to No. 4 blast furnace slag using hydraulic slag before the blast furnace slag treatment of the other three, are used to carry out a tank slag tank slag water quenching. Slag dredger 1 slag bath was put into operation in 1960, with two 33.2 × 12 × 7.2 m slag pool, a total volume of 5737 m ~ 3. Its main equipment has skull capping machine, slag tank tipping machine and 15 tons of bridge grab crane. 1986 annual output of slag reached 1.1 million tons. No. 1 bubble slag pool current slag water quenching process according to standardized procedures. However, in the winter season of water quenching process, the explosion phenomenon more frequently. According to incomplete statistics, 1985 10