论文部分内容阅读
针对孙村煤矿-800m水平运输巷的具体条件介绍了锚杆支护的设计方法,并对监测结果进行分析评价,证明了锚杆支护的可行性。
Aiming at the specific conditions of -800m horizontal transportation lane in Suncun Coal Mine, the design method of bolt support is introduced, and the monitoring results are analyzed and evaluated to prove the feasibility of bolt support.