我国的电力设计有很大的技术突破,加入WTO以后面临经济快速全球化的新形势,市场发展状况很不乐观,为了在电力工程上形成与国际接轨的工程承包机制,要大力的培育和发展我国的电力工程项目建设。本文在分析了我国电力工程总承包能力发展现状的基础上,主要从管理方面提出了提升我国的电力设计院工程总承包能力的相关对策,以用来解决一些工程承包方面的问题。
China’s power design has a great technological breakthrough. After joining the WTO, it faces a new situation of rapid global economic globalization. Its market development is not optimistic. In order to form an engineering contracting system that is in line with international standards in power engineering, we must vigorously nurture and develop China’s power project construction. Based on the analysis of the status quo of China’s power contracting capacity development, this paper puts forward some countermeasures to improve the general contract contracting power capacity of China’s power design institute mainly from the aspects of management, in order to solve some problems in project contracting.