成灌铁路某桥采用48 m后张法预应力混凝土梁,施工方案为移动模架施工,除第一孔能满足两端张拉外,其余孔跨均需采用单端张拉,为满足设计要求,准确测定预应力孔道的摩阻系数对指导施工具有重要的意义。试验采用穿心式索力传感器测定预应力张拉力,该类传感器通常用于斜拉索、吊杆等桥梁结构的测量,通过对数据的细致分析,验证该传感器在预应力孔道摩阻系数测定中应用的可行性。
The 48-meter post-tensioned prestressed concrete beam is used in a bridge of Cheng-Ir Railway. The construction scheme is the construction of a movable formwork. Except that the first hole can meet both ends of the tensioning, all other cross-holes shall adopt single-ended tensioning. To meet the design requirements Demands and accurate determination of the friction coefficient of prestressed tunnels are of great significance to guide the construction. The test uses the through-core cable force sensor to measure the prestressing tensile force. Such sensors are usually used to measure the structure of the bridge such as stay cables and hangers. Detailed analysis of the data verifies that the sensor measures the friction coefficient In the application of the feasibility.