对本钢5号高炉投产后冷却壁破损情况处理与分析。5号高炉2001年改造后投产以来,一直处于稳定、高产状态。但2003年8月冷却壁出现破损现象,特别是2005年-2007年冷却壁破损较为严重。2007年3月11日年修将8段破损铜冷却壁管根处钢甲割开,发现冷却壁管根有断裂现象,分析原因是由于剪切应力造成的,于是进行铜冷却壁管根修复。又将冷却壁外部连接硬管改为软硬结合的连接方式。通过近两年实践、摸索出一套铜冷却壁管根断裂的处理经验。为高炉稳定顺行提供了可靠的保证。
Treatment and Analysis of Cooling Stave Damage of Benxi Iron and Steel ’s No. After the blast furnace 5 was put into operation in 2001, it has been in a stable and high-yield state. However, in August 2003, the cooling stave appeared damaged, especially in 2005-2007, the stave was more damaged. March 11, 2007 annual repair will be 8 sections of damaged copper tube wall cooling pipe cut off and found that the cooling tube wall root fracture, the analysis is due to shear stress caused, so the copper cooling tube root repair . Turn the outer wall of the cooling wall to hard and soft combination of the connection. After nearly two years of practice, to explore a set of copper cooling pipe root fracture experience. Stable and forward for the blast furnace provides a reliable guarantee.