甘豪矿井下火药库,因设计位置不当,使主库房正处在较复杂的水文地质条件中,南北有两条断层斜交通过。因受断层错动,使主库房接近砂岩含水层,在主体工程完工后,因涌水和淋水面积过大,不能交付使用。矿井定为84年12月移交生产,工期紧迫,为保持火药库的干燥又能按期投产,我们对主库房淋水地段,采取注、堵和疏导的治水方法,取得了良好的效果,从而避免了火药库搬换位置的浪费,其施工方法简介如下: Ganhu underground mine powder library, due to improper design of the location, so that the main reservoir is in more complex hydrogeological conditions, north-south two cross-section through the fault. Due to fault dislocations, the main cofferdam is close to the sandstone aquifer. After the main project is completed, it can not be delivered due to the gushing and sprinkling area is too large. The mine was scheduled to be handed over to production in December, 84. Due to the tight deadline, in order to maintain the dryness of the powder repositories and put into operation on schedule, we have taken good measures to prevent, The gunpowder warehouse to change the location of the waste, the construction method is as follows:
其他文献
工作面的技术经济指标由于工作面端头业机械化程度低而不能提高,因此端头作业劳动量平均占回采工作面总劳动量的25%,在个别情况下高达30—40%。手工开切口在全部劳动量中所占
早在90年代初,我国的一些有识之士曾忠告说:公元21世纪初甚至就是现在,中国人将告别旧的经济体制,全新的市场经济将与世界经济正式甚至完全接轨———“中国的商品将更多地走向世界,外
作者从对外技术合作中经历的事例中体会到,了解、熟悉、掌握并正确运用有关标准和规范,搞清国际标准和我国标准的相互关系,特别是取得直接涉及到技术合作的外贸产品的质量认可,对
1979~1981年,在A·M·米海柳科领导下的顿涅茨建井局第三凿井处的凿井队建成了顿涅茨煤炭生产联合企业的A·φ·扎夏季科矿的东风井。井深1085m,净直径6m,掘进直径7m,整体浇灌
为加速我国有色金属工业的发展和扩大新工艺、新技术、新设备的研制和应用,我院与有关单位配合,1984年科研工作取得了较大的进展,全年获得省级以上鉴定的重要科学技术成果21
我矿460硐于1981年7月投产的2×2m~2断面、高110m的溜井使用的放矿漏斗是我矿自行设计的矩形井架式电振漏斗。经三年多的使用证明,它除具有FZC-3型电振出矿机的优点外,还有
批量生产的以及根据工作面支架制造的端头支架在卧底量超过0.3~0.4米掘进的巷道内使用效果不佳,支架底座易于压入底板,因而不能把皮带输送机拉紧端设在巷道内。支架在横向负
该项目是国家“七五”攻关“细胞工程育种”专题和国家“八五”攻关“新生物技术研究”专题。由我院李文泽教授主持,经长达10年的研究取得重要进展:①建立了一套“大麦花粉植
缓倾斜及倾斜厚煤层采用长壁分层下行采煤法开采时,第一分层工作面采用全部垮落法来处理采空区,在回采以下几个分层时,必须事先铺设金属网假顶和底网。但在顶板破碎难以控制
在金或铂的砂矿开采实践中,经常会遇到需要在校大距离内快速迁移采金船的问题.在南佐捷尔斯克砂矿,每来完一个区段之后,都要将采金船迁移一次.伊尔库茨克重型机械厂,1956年