大封门水库集雨面积25.8平方公里,正常水位库容550万立方米。两岸及坝基为较完整的花岗岩盘石,仅右岸252米高程以上岩石较为破碎,V型河谷,高宽比为1:2.9,适合建造拱坝。石拱坝溢流段高45米,非溢流段高48.5米;拱顶断面坝底厚11.6米,坝顶厚2米;河底平均宽15米,坝轴线长140米,弧长150米。计划工作量浆砌石1.55万立方米,混凝土1.05万立方米。该坝于一九七○年春正式施工,至一九七四年冬完成坝高41米。施工过程中每年洪水过坝溢流,一九七三年最大过水深1.1米,通过流量158秒立方米,根据观测未发现异常现象。
Dafengmen Reservoir rainfall area of 25.8 square kilometers, the normal water storage capacity of 5.5 million cubic meters. Both sides of the dam and the dam foundation are more intact granite rocks. Broken rocks above 252 meters on the right bank are more fragmented. The V-shaped valley has an aspect ratio of 1: 2.9 and is suitable for arch dam construction. The arch dam overflow section 45 meters high, non-overflow section 48.5 meters high; vault section bottom 11.6 meters thick, dam top 2 meters thick; riverbed average width 15 meters, dam axis length 140 meters, arc length 150 meters . The planned workload is 15,500 cubic meters of masonry and 10,500 cubic meters of concrete. The dam was formally constructed in the spring of 1970 and completed a height of 41 meters by the winter of 1974. During the construction, flooding overflows every year. In 1973, the maximum water depth was 1.1 meters and the flow rate was 158 seconds. No abnormalities were observed according to the observation.