急倾斜中厚煤层长壁后退台阶采煤法

来源 :煤矿开采 | 被引量 : 0次 | 上传用户:mn666666
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
在急倾斜中厚煤层开采中,将长壁后退回采工作面施工成倒台阶状,按长壁采煤工艺正常开帮回采,即长壁后退台阶采煤法。每个台阶倾斜长25~30m,成正伪斜6~8°布置,工作面设置防矸木带、挡煤板,以防止采后矸石冲击支柱和煤炭窜入采空区,采用煤矸砼墙护巷。针对上巷集中应力,采取加强巷内支护、采后卸载与调整台阶尺寸(上长下短)等措施,保证上巷行人和运输安全。 In the mining of steeply inclined middle-thick coal seams, the long-wall back-off working face is constructed into an inverted staircase, and the longwall coal mining process is normally used for mining, that is, the longwall back-step coal mining method. Each step inclined 25 ~ 30m, into the pseudo-oblique 6 ~ 8 ° layout, the face with anti-gangue wood, blocking the coal to prevent post-harvest gangue impact of pillars and coal into the goaf, the use of concrete wall Lane protection. Focus on the stress on the lane, take to strengthen the laneway support, post-harvest uninstall and adjust the step size (up and down short) and other measures to ensure the safety of pedestrians and transport lane.
其他文献
“营改增”后,增值税政策的不断变化对涉及建筑业的石油工程企业产生了较大影响,成为企业经营发展着重关注的问题之一.本文以JS石油工程公司为例,以减税降费的大环境为背景,
对建筑工程管理进行创新是建筑行业在当前经济社会背景下发展的必然方向,并且强化管理方式应用能有效提高建筑建设质量,也能降低施工成本,缩短施工期限,将企业的整体经济效益
由于建设工程项目的 工程量大、程序复杂,难度系数高,因此涉及许多细小工程,例如建筑水电的安装,土木工程的建设以及装修工程,特别是对水电项目的 安装,它在整个建设项目中起
随着时代不断发展,我国工程建设也在持续发展.经济更是持续走高,其中大部分都归功于我国工程建设高速发展.由于工程建设发展迅速,人们越来越多对于工程建设施工中出现的问题,
本文主要从配制预拌混凝土的细骨料——天然砂和人工砂加入到混凝土中,通过掺加不同砂样,并对C25强度等级的预拌混凝土和易性、强度等性能的对比,对人工砂在预拌混凝土的应用
通过对实际工作中预算编制及审核出现的主要问题进行汇总,并对问题出现的原因进行了分析.从业主编制投标控制价及审核施工单位投标报价两个方面,提出了预算审核工作的要点,为
铁法矿区为消除瓦斯灾害,变害为利,自1958年投产至今探索出多种瓦斯抽放方法,为矿区煤层瓦斯资源的开发和利用,保证安全生产奠定了坚实的基础。 In order to eliminate gas disa
决定建筑企业发展速度的主要因素就是建筑工程施工管理,只有重视建筑工程的施工管理,不断发现建筑工程施工管理过程中的各项问题,并进行有效地解决,才能促进整个建筑行业的不
胡锦涛同志在庆祝中国共产党成立90周年大会上强调:“每一个共产党员都要把人民放在心中最高位置,尊重人民主体地位,尊重人民首创精神,拜人民为师,把政治智慧的增长、执政本
为解决蔬菜穴盘育苗基质合理的养分供应问题,本课题以番茄、甜椒为试材,以草炭:蛭石=2∶1(体积比)为育苗基质,在筛选出基质氮磷钾养分适用量的基础上,采用“311-A"最优混合设计